Skillset Dubbo Campus – New COLA for undercover basketball court

Location: Dubbo, NSW | Duration: 2 Months | Client: Skillset Dubbo Campus

Project Overview

Omni Building Group was commissioned to design and construct a Covered Outdoor Learning Area (COLA) at Skillset Dubbo Campus, creating a sheltered space for year-round basketball and outdoor activities. This structure was specifically tailored to enhance the utility of the existing basketball court, ensuring a functional, weather-resistant environment for sports, assemblies, and recreational use.

Scope of Works

The scope of works for this project included:

  • Initial Site Preparation: Site clearing and preparation works were undertaken with a focus on preserving the integrity of the existing basketball court while ensuring a safe and efficient construction site.
  • Concrete Piers: Installation of deep concrete piers to provide a stable foundation system suitable for supporting the significant structural loads of the large overhead shelter.
  • Structural Steelwork: Erection of structural steel columns and rafters, engineered to span the full width of the basketball court, offering unobstructed coverage and long-term durability.
  • Roofing and Drainage: Installation of a high-quality metal roof system with integrated roof plumbing and drainage solutions to ensure effective water management and protect the playing surface from the elements.

Challenges & Solutions

  • Working Over an Existing Facility: Constructing over an operational basketball court required careful sequencing and protective measures to avoid damage to the playing surface. OMNI’s team implemented a range of protective strategies and scheduled works to reduce downtime and ensure safety.
  • Precision Engineering: The structural components required precise coordination to ensure accurate alignment and fitment. Our team worked closely with structural engineers and suppliers to pre-plan each stage, ensuring seamless assembly and structural integrity.
  • Weather Resilience: With a key aim of providing an all-weather facility, roofing and drainage design were critical. OMNI delivered a tailored solution that ensures reliable water runoff and long-term weather resistance.

Outcome

The project was completed on schedule and met all functional and aesthetic expectations. The newly constructed COLA now provides Skillset with a versatile, all-weather learning and recreation area that significantly enhances the usability of the space.

The client was particularly pleased with OMNI Building Group’s attention to detail, communication throughout the project, and the team’s ability to work efficiently without disrupting surrounding activities. The successful delivery of this project further demonstrates OMNI’s capabilities in constructing bespoke education and community facilities that are both practical and visually cohesive.